Lianmuqin Station Air Cooling Project Tender Notice

Project Name Lianmuqi Station Air Cooling Project
Item Number-WOPC-0000813
I. Tender conditions
This service project has fulfilled the relevant approval and filing procedures as required. The funds have been implemented and the conditions for tendering have been met.
II. Overview and scope of tender
Lianmuqi station GE gas intake cooling project has obtained the establishment of the company and the production technical service center is responsible for the implementation of this project. At present, the funds for the project have been implemented, and other relevant approval procedures have been completed and the tender conditions have been met.
According to the model and environmental conditions of Lianmujing station GE gas turbine, an inlet spray cooling system is designed, and follow-up installation, commissioning and training are carried out. Duration: 120 calendar days from the signing date of the contract.
III. Bidder qualification requirements
1. The Commonwealth does not accept bids from the Commonwealth. 2. It is the total integrator of the compressor, or the original manufacturer of the compressor-related maintenance parts, or the company that has the compressor maintenance qualification. 3. Two or more legal persons whose legal representative is the same person, and the parent company, wholly-owned subsidiary company and its holding company, shall not submit simultaneous bids in the same tender.
IV. Acquisition of tender documents
The tender documents will be issued on the 11th of November at 10:00:00

Commercial Energy Storage System

Outdoor energy storage system 200KWh,Photovoltaic Energy Storage System,power storage system,LiFePO4 Energy Storage,smart energy storage,Reliable energy storage system

EMoreShare International Trade (Suzhou) Co., Ltd , https://www.emoreshare.com

Posted on